Program 16

Primary tabs

Proposal: 
OEODWkMfyDZTqUlVCT
Target of Oportunity: 
No
Time Observed: 
2.0
Time Engineering: 
8.75
Time lost technical: 
11.0
Time lost weather: 
5.0
Time lost other: 
3.25
Description: 
I didn't go to university http://www.fysiotherapiethuisamsterdam.nl/about/ stromectol ivermectin Three-month copper on the London Metal Exchange rose3.3 percent to $7,049.25 a tonne, its highest since June 18.Benchmark copper on the Shanghai Futures Exc
Primary Investigator: 
mgpgaXFdgRnEqB
Institution: 
Penn State
Instrument: 
CTIO 4m Hydra
Organization: 
MSU
Total Program Time: 
30