Program 1

Primary tabs

Proposal: 
2012B-9993
Target of Oportunity: 
No
Time Observed: 
4.5
Time Engineering: 
0.0
Time lost technical: 
0.0
Time lost weather: 
7.0
Time lost other: 
0.0
Description: 
Engineering
Primary Investigator: 
Walker
Institution: 
CTIO
Instrument: 
CTIO 4m DECam
Organization: 
NOAO
Total Program Time: 
11.5