Program 2

Primary tabs

Proposal: 
2019B-0219 Shen
Target of Oportunity: 
No
Time Observed: 
4.75
Time Engineering: 
0.0
Time lost technical: 
0.0
Time lost weather: 
0.0
Time lost other: 
0.0
Description: 
DECAT
Instrument: 
CTIO 4m DECam
Total Program Time: 
4.75