Program 2

Primary tabs

Proposal: 
2017A-0147
Target of Oportunity: 
No
Time Observed: 
5.75
Time Engineering: 
0.0
Time lost technical: 
0.0
Time lost weather: 
0.0
Time lost other: 
0.0
Description: 
Recovery of 2008 UB7
Primary Investigator: 
Micheli
Institution: 
ESA
Instrument: 
CTIO Schmidt DECam
Organization: 
NOAO
Total Program Time: 
5.75