Program 1

Primary tabs

Proposal: 
2017A-0388
Target of Oportunity: 
No
Time Observed: 
7.0
Time Engineering: 
2.5
Time lost technical: 
0.0
Time lost weather: 
0.0
Time lost other: 
0.0
Description: 
Completing the Southern eROSITA Sky with DECam
Primary Investigator: 
Alfredo Zenteno
Institution: 
CTIO
Instrument: 
CTIO 4m DECam
Total Program Time: 
9.5