Program 1

Primary tabs

Proposal: 
2016A-0616
Target of Oportunity: 
No
Time Observed: 
8.0
Time Engineering: 
0.0
Time lost technical: 
0.5
Time lost weather: 
3.0
Time lost other: 
0.0
Description: 
Spec. Follow up High proper motion sources from VVV
Primary Investigator: 
Juan Carlos Beamin
Institution: 
Uni de Valparaiso
Instrument: 
CTIO 4m ArCoIRIS
Organization: 
Chile
Total Program Time: 
11.5