Program 1

Primary tabs

Proposal: 
2013B-9999
Target of Oportunity: 
No
Time Observed: 
0.0
Time Engineering: 
0.0
Time lost technical: 
0.0
Time lost weather: 
11.5
Time lost other: 
0.0
Description: 
DECam/Blanco engineering
Primary Investigator: 
Alistair Walker
Institution: 
CTIO
Instrument: 
CTIO 4m DECam
Organization: 
NOAO
Total Program Time: 
11.5