Program 1

Primary tabs

Proposal: 
2015A-0322
Target of Oportunity: 
No
Time Observed: 
0.0
Time Engineering: 
0.0
Time lost technical: 
0.0
Time lost weather: 
11.25
Time lost other: 
0.0
Description: 
Blanco DECam bulge Survey
Primary Investigator: 
Rich
Institution: 
UCLA
Instrument: 
CTIO 4m DECam
Organization: 
NOAO
Total Program Time: 
11.25