Program 1

Primary tabs

Proposal: 
Engineering
Target of Oportunity: 
yes
Time Observed: 
0.25
Time Engineering: 
7.5
Time lost technical: 
0.0
Time lost weather: 
0.0
Time lost other: 
0.0
Primary Investigator: 
Alisair Walker
Institution: 
CTIO
Instrument: 
CTIO 4m DECam
Total Program Time: 
7.75