Program 1

Primary tabs

Proposal: 
Engineering
Target of Oportunity: 
No
Time Observed: 
0.0
Time Engineering: 
8.0
Time lost technical: 
0.0
Time lost weather: 
0.0
Time lost other: 
0.0
Description: 
DECam checkout, testing hexapod LUT, primary mirror LUT
Primary Investigator: 
ALISTAIR WALKER
Institution: 
CTIO
Instrument: 
CTIO 4m DECam
Total Program Time: 
8