Program 1

Primary tabs

Target of Oportunity: 
No
Time Observed: 
0.0
Time Engineering: 
9.0
Time lost technical: 
0.0
Time lost weather: 
1.0
Time lost other: 
0.0
Institution: 
CTIO
Instrument: 
CTIO 4m DECam
Total Program Time: 
10