Program 1

Primary tabs

Proposal: 
2012A-9999
Target of Oportunity: 
No
Time Observed: 
0.0
Time Engineering: 
8.25
Time lost technical: 
3.25
Time lost weather: 
0.0
Time lost other: 
0.0
Description: 
Blanco engineering
Primary Investigator: 
Tim Abbott
Institution: 
CTIO
Instrument: 
CTIO 4m DECam
Organization: 
NOAO
Total Program Time: 
11.5