Program 1

Primary tabs

Proposal: 
SMASH
Target of Oportunity: 
No
Time Observed: 
11.25
Time Engineering: 
0.0
Time lost technical: 
0.0
Time lost weather: 
0.25
Time lost other: 
0.0
Description: 
Survey
Primary Investigator: 
David Nidever
Institution: 
U. Michigan
Instrument: 
CTIO 4m DECam
Total Program Time: 
11.5