Program 1

Primary tabs

Proposal: 
2013B-0536
Target of Oportunity: 
No
Time Observed: 
10.5
Time Engineering: 
0.0
Time lost technical: 
0.0
Time lost weather: 
0.0
Time lost other: 
0.0
Description: 
The DECam NEO Survey
Primary Investigator: 
Lori Allen
Institution: 
NOAO
Instrument: 
CTIO 4m DECam
Organization: 
NOAO
Total Program Time: 
10.5