Program 1

Primary tabs

Proposal: 
2014A-2012
Target of Oportunity: 
No
Time Observed: 
9.0
Time Engineering: 
1.5
Time lost technical: 
0.0
Time lost weather: 
0.0
Time lost other: 
0.0
Description: 
COSMOS commissioning
Primary Investigator: 
Elias
Institution: 
NOAO
Organization: 
NOAO
Total Program Time: 
10.5