Program 1

Primary tabs

Proposal: 
2012B-0001 / 2013B-0440
Target of Oportunity: 
No
Time Observed: 
7.5
Time Engineering: 
0.0
Time lost technical: 
0.0
Time lost weather: 
0.0
Time lost other: 
0.0
Description: 
DES (second half: SMASH)
Primary Investigator: 
Josh Frieman / D. Nidever
Institution: 
Fermilab
Instrument: 
CTIO 4m DECam
Total Program Time: 
7.5