Program 2

Primary tabs

Proposal: 
2013B-0421
Target of Oportunity: 
No
Time Observed: 
0.5
Time Engineering: 
0.0
Time lost technical: 
0.0
Time lost weather: 
0.0
Time lost other: 
0.0
Description: 
Eta Car
Primary Investigator: 
A. Rest
Institution: 
STSCI
Instrument: 
CTIO 4m DECam
Organization: 
DD
Total Program Time: 
0.5