Program 1

Primary tabs

Target of Oportunity: 
yes
Time Observed: 
8.75
Time Engineering: 
8.75
Time lost technical: 
0.0
Time lost weather: 
0.0
Time lost other: 
0.0
Description: 
f8 engineering
Primary Investigator: 
Tim Abbott
Institution: 
CTIO
Instrument: 
CTIO 4m ISPI
Organization: 
NOAO
Total Program Time: 
17.5