Program 1

Primary tabs

Proposal: 
2013A-0719
Target of Oportunity: 
yes
Time Observed: 
10.75
Time Engineering: 
0.0
Time lost technical: 
0.0
Time lost weather: 
0.0
Time lost other: 
0.0
Description: 
Synoptic survey of Bulge
Primary Investigator: 
A. Saha
Institution: 
NOAO
Instrument: 
CTIO 4m DECam
Organization: 
NOAO
Total Program Time: 
10.75