Date:
Tuesday, August 16, 2016
Telescope:
CTIO Blanco 4-m
Submitter:
Tim Abbott
Submitter Email:
Observer Support:
Hernan Tirado
Night Assistant:
Alberto Alvarez
Problems:
None.
Comments:
- Tested AOS8 mode, 'works great!
- Collected star flat data
- Observed an HST standard for Alistar
- Ran DES pipeline test for Marcelle
- Collected ~1hr of data for DECamERON
- Ran a hexapod-locked starmap
Program:
Proposal:
2013A-9999
Target of Oportunity:
No
Time Observed:
0.0
Time Engineering:
11.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
DECam/Blanco engineering
Primary Investigator:
Alistair Walker
Email:
Institution:
NOAO
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
11
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2016-08-16 | 0.0 | 11.0 | 0.0 | 0.0 | 0.0 | 11 |