Proposal:
2013A-9999
Target of Oportunity:
No
Time Observed:
0.0
Time Engineering:
11.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
DECam/Blanco engineering
Primary Investigator:
Alistair Walker
Email:
Institution:
NOAO
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
11