Date:
Sunday, January 10, 2016
Telescope:
CTIO Blanco 4-m
Submitter:
Bob Blum
Submitter Email:
Observer Support:
Hernan Tirado
Night Assistant:
Carlos Corco
Problems:
None.
Program:
Proposal:
2012B-0001
Target of Oportunity:
No
Time Observed:
4.0
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
DES
Primary Investigator:
Frieman
Email:
Institution:
Fermilab
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
4
Proposal:
2014B-0404
Target of Oportunity:
No
Time Observed:
4.0
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
DECaLS
Primary Investigator:
David Schlegel and Arjun Dey
Email:
Institution:
Lawrence Berkeley National Laboratory
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
4
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2016-01-10 | 8.0 | 0.0 | 0.0 | 0.0 | 0.0 | 8 |
Smooth night!
It was a huge pleasure to be here again, and see and work with you all. Great run or DECaLS. THANKS!
DIMM stopped at 03:55 local.
DES night summary http://des-ops.fnal.gov:8080/nightsum/nightsum-2016-01-10/nightsum.html