Proposal:
2012B-0001
Target of Oportunity:
No
Time Observed:
4.0
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
DES
Primary Investigator:
Frieman
Email:
frieman@fnal.gov [1]
Institution:
Fermilab
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
4
Smooth night!
It was a huge pleasure to be here again, and see and work with you all. Great run or DECaLS. THANKS!
DIMM stopped at 03:55 local.
DES night summary http://des-ops.fnal.gov:8080/nightsum/nightsum-2016-01-10/nightsum.html