Date:
Saturday, November 28, 2015
Telescope:
CTIO Blanco 4-m
Submitter:
Antonella Palmese
Submitter Email:
Observer Support:
Hernan Tirado
Night Assistant:
Carlos Corco
Also Present:
Javier Rojas, Alfredo Zenteno, Claudio Aguilera
Problems:
DECam was not receiving SISPI commands.
Program:
Proposal:
2012B-0001
Target of Oportunity:
No
Time Observed:
5.0
Time Engineering:
0.0
Time lost technical:
2.75
Time lost weather:
0.0
Time lost other:
0.0
Primary Investigator:
Frieman
Email:
Institution:
Fermilab
Instrument:
CTIO 4m DECam
Total Program Time:
7.75
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2015-11-28 | 5.0 | 0.0 | 2.75 | 0.0 | 0.0 | 7.75 |
Telescope Operators worked to solve the problem with SISPI from 2pm.
From Alastair W: "pipeline4 showed lots of problems during the day and there were a couple of kernel error messages when being started up now [at ~11pm]." On his suggestion, pipeline 4 was not used and then SISPI came up: architect -c DES_nopipeline4.ini"
We managed to have our first exposure at 00:24am (local time).
DECam night summary: file:///usr/remote/user/sispi/nightsum-reports/nightsum-2015-11-28/nightsum.html