Proposal:
2012B-0001
Target of Oportunity:
No
Time Observed:
5.0
Time Engineering:
0.0
Time lost technical:
2.75
Time lost weather:
0.0
Time lost other:
0.0
Primary Investigator:
Frieman
Email:
frieman@fnal.gov [1]
Institution:
Fermilab
Instrument:
CTIO 4m DECam
Total Program Time:
7.75
Telescope Operators worked to solve the problem with SISPI from 2pm.
From Alastair W: "pipeline4 showed lots of problems during the day and there were a couple of kernel error messages when being started up now [at ~11pm]." On his suggestion, pipeline 4 was not used and then SISPI came up: architect -c DES_nopipeline4.ini"
We managed to have our first exposure at 00:24am (local time).
DECam night summary: file:///usr/remote/user/sispi/nightsum-reports/nightsum-2015-11-28/nightsum.html