Date:
Sunday, October 20, 2013
Telescope:
CTIO Blanco 4-m
Submitter:
Tiim Abbott
Submitter Email:
Observer Support:
Hernan Tirado
Night Assistant:
Claudio Aguilera
Also Present:
Nicole van der Bliek
Problems:
None.
Program:
Target of Oportunity:
yes
Time Observed:
8.75
Time Engineering:
8.75
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
f8 engineering
Primary Investigator:
Tim Abbott
Email:
Institution:
CTIO
Instrument:
CTIO 4m ISPI
Organization:
NOAO
Total Program Time:
17.5
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2013-10-20 | 8.75 | 8.75 | 0.0 | 0.0 | 0.0 | 17.5 |
f8 engineering - nearly done.
Tonight, during episodes of bad seeing, some science & PR data were collected otherwise image quality data were collected and f8 functions tested