Target of Oportunity:
yes
Time Observed:
8.75
Time Engineering:
8.75
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
f8 engineering
Primary Investigator:
Tim Abbott
Email:
Institution:
CTIO
Instrument:
CTIO 4m ISPI
Organization:
NOAO
Total Program Time:
17.5
f8 engineering - nearly done.
Tonight, during episodes of bad seeing, some science & PR data were collected otherwise image quality data were collected and f8 functions tested