You are here

ENR CTIO Blanco 4-m 2013-07-14

Primary tabs

Date: 
Sunday, July 14, 2013
Telescope: 
CTIO Blanco 4-m
Submitter: 
Andrea Kunder & Chris Lidman
Submitter Email: 
Observer Support: 
Hernan Tirado
Night Assistant: 
Claudio Aguilera
Problems: 

Observer Console GUI timed out twice during the night.

Their were ~10 incidences when the guider failed to pick up guide stars in the crowded fields. 

Chris Lidman noticed a bug in the scripts editor -- when entering a dither step in RA, the scripts editor does not calculate the cosine delta in right ascension when determining the appropriate offset.  Can this be quickly fixed?  Otherwise it would be good to put a caveat about this in the scripts editor documentation.  Maybe this bug is why the "Center CCD" in the scripts editor does not work correctly?

When an observer logs into the night report with the generic "astronomer" login, they do not have permissions to edit an already started night report.  When there are two half nights with different observers, this makes it impossible to submit a complete night report from both halfs.  In this case, I (Andrea) have my own CTIO webpage login and am able to edit the report and include Chris's comments from the second half of the night. 

Comments: 

None.

Conditions: 
General Conditions
Comment: 
None.
1st Quarter
Clouds: 
Clear
Wind: 
Low
Seeing Value: 
1.10
Seeing Variability: 
0.2
Seeing Source: 
The Telescope I used
Sky : 
0
2nd Quarter
Clouds: 
Clear
Wind: 
Low
Seeing Value: 
1.10
Seeing Variability: 
0.2
Seeing Source: 
The Telescope I used
Sky: 
0
3rd Quarter
Clouds: 
Clear
Wind: 
Low
Seeing Value: 
1.10
Seeing Variability: 
0.2
Seeing Source: 
The Telescope I used
Sky: 
0
4th Quarter
Clouds: 
Clear
Wind: 
Low
Seeing Value: 
1.10
Seeing Variability: 
0.2
Seeing Source: 
The Telescope I used
Sky: 
0
Program: 
Proposal: 
2013A-0529
Target of Oportunity: 
No
Time Observed: 
5.5
Time Engineering: 
0.0
Time lost technical: 
0.0
Time lost weather: 
0.0
Time lost other: 
0.0
Description: 
Bulge survey
Primary Investigator: 
R.M. Rich
Email: 
Institution: 
NOAO
Instrument: 
CTIO 4m DECam
Organization: 
DD
Total Program Time: 
5.5
Proposal: 
0618
Target of Oportunity: 
No
Time Observed: 
5.5
Time Engineering: 
0.0
Time lost technical: 
0.0
Time lost weather: 
0.0
Time lost other: 
0.0
Description: 
weak lensing
Primary Investigator: 
Lidman
Institution: 
AAO
Instrument: 
CTIO 4m DECam
Organization: 
N/A
Total Program Time: 
5.5
Total Times Time Observed Time Engineering Time lost technical Time lost weather Time lost other Total Program Time
2013-07-14 11.0 0.0 0.0 0.0 0.0 11