Problems:
None.
Program:
Proposal:
2017A-0260
Target of Oportunity:
No
Time Observed:
5.75
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
BLISS
Primary Investigator:
Soares-Santos
Email:
Institution:
Fermilab
Instrument:
CTIO 4m DECam
Total Program Time:
5.75
Proposal:
2017A-0147
Target of Oportunity:
No
Time Observed:
5.75
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
Recovery of 2008 UB7
Primary Investigator:
Micheli
Email:
Institution:
ESA
Instrument:
CTIO Schmidt DECam
Organization:
NOAO
Total Program Time:
5.75
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2017-06-01 | 11.5 | 0.0 | 0.0 | 0.0 | 0.0 | 11.5 |
At the beginning of the night we started a few minutes later because the pipeproc 3 and 4 were down. After restarting pipeproc were back. We were still able to start the scientific observation in time.
During second half of night we did several non-sidereal rate observations.