Proposal:
2017A-0260
Target of Oportunity:
No
Time Observed:
5.75
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
BLISS
Primary Investigator:
Soares-Santos
Email:
Institution:
Fermilab
Instrument:
CTIO 4m DECam
Total Program Time:
5.75
At the beginning of the night we started a few minutes later because the pipeproc 3 and 4 were down. After restarting pipeproc were back. We were still able to start the scientific observation in time.
During second half of night we did several non-sidereal rate observations.