Problems:
There was another telescope driver failure tonight. This caused a loss of about 1.75 hours of observation. The operators determined that we could avoid the problem by limiting ourselves to targets with dec <+13 deg. We were able to comply with this constraint. Observations in our program's run in a week's time will need to be conducted at dec >+13 deg and so this problem will need to be fixed by then.
Program:
Proposal:
2014B-0404
Target of Oportunity:
No
Time Observed:
8.25
Time Engineering:
0.0
Time lost technical:
1.75
Time lost weather:
0.0
Time lost other:
0.0
Description:
DECaLS
Primary Investigator:
David Schlegel
Email:
Institution:
Lawrence Berkeley National Laboratory
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
10
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2015-03-29 | 8.25 | 0.0 | 1.75 | 0.0 | 0.0 | 10 |