Date:
Thursday, November 13, 2014
Telescope:
CTIO Blanco 4-m
Submitter:
Chris D'Andrea
Submitter Email:
Observer Support:
Hernan Tirado
Night Assistant:
Claudio Aguilera
Also Present:
Dominik Gangkofner, Ting Li
Problems:
While slewing to the first of our morning standard stars, an error occurred (05:34 local) that halted the telescope before it reached the field. TelOps support indicated that the cause of the problem is not currently fixed, and has either submitted or will submit a separate report (we did not understand to where).
Program:
Proposal:
2012B-0001
Target of Oportunity:
No
Time Observed:
8.5
Time Engineering:
0.0
Time lost technical:
0.25
Time lost weather:
0.0
Time lost other:
0.0
Description:
Dark Energy Survey
Primary Investigator:
Frieman
Email:
Institution:
Fermilab
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
8.75
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2014-11-13 | 8.5 | 0.0 | 0.25 | 0.0 | 0.0 | 8.75 |
We define low wind as <8 mph; medium as 8 - 15 mph; and high as >15mph
First hour of the night had 10mph winds, dropping rapidly to 3mph. So first quarter night was, on average, low wind.