Date:
Friday, January 3, 2014
Telescope:
CTIO Blanco 4-m
Submitter:
Tim Abbott
Submitter Email:
Observer Support:
Manuel Hernandez
Night Assistant:
Alberto Alvarez
Also Present:
James Etherington, Philip Rooney
Problems:
None.One shutter error, recovery required restarting SISPI, ~15 min lost
TCS console computer crashed, rebooted OK, no time lost
Program:
Proposal:
2012B-0001
Target of Oportunity:
No
Time Observed:
7.25
Time Engineering:
0.0
Time lost technical:
0.25
Time lost weather:
0.0
Time lost other:
0.0
Description:
DES
Primary Investigator:
Josh Frieman
Email:
Institution:
Fermilab
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
7.5
Proposal:
sAyjgLSDXg
Target of Oportunity:
No
Time Observed:
6.5
Time Engineering:
8.25
Time lost technical:
3.25
Time lost weather:
9.25
Time lost other:
0.75
Description:
fedcz8 <a href="http://thsigwkjhrxn.com/">thsigwkjhrxn</a>, [url=http://fgbbcjcqbrcl.com/]fgbbcjcqbrcl[/url], [link=http://jncpnmtuwzgn.com/]jncpnmtuwzgn[/link], http://dsadefanmbdu.com/
Primary Investigator:
lxSVdaFIzDjOk
Email:
Institution:
Lowell Observatory
Instrument:
CTIO 4m RcSpect
Organization:
Brazil
Total Program Time:
28
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2014-01-03 | 13.75 | 8.25 | 3.5 | 9.25 | 0.75 | 35.5 |
Observing Team
DES Observers: James Etherington, Tim Abbott, Philip Rooney
Telops: Manuel Hernandez, Alberto Alvarez
Remote Support: —-
Observing Plan
Conditions
Accomplishments
Problems and solutions
Comments
the FS4, FN2 CCDs with some sort of charge transfer problem.
Notes for Data Management
271202
271204