Date:
Friday, April 26, 2013
Telescope:
CTIO Blanco 4-m
Submitter:
Jacqueline McCleary
Submitter Email:
Observer Support:
Mauricio Rojas
Night Assistant:
Alberto Alvarez
Also Present:
A. Kunder, David Rojas
Problems:
- Unable to login with proposal ID
- SISPI issues around 10 am
- Brief interlock error around 4 am
Program:
Proposal:
2013A-0717
Target of Oportunity:
No
Time Observed:
11.5
Time Engineering:
0.0
Time lost technical:
1.5
Time lost weather:
0.0
Time lost other:
0.0
Description:
Weak Lensing of Low-Redshift Clusters and Large Scale Structures
Primary Investigator:
Ian dell'Antonio
Email:
Institution:
Brown University
Instrument:
CTIO 4m DECam
Organization:
DD
Total Program Time:
13
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2013-04-26 | 11.5 | 0.0 | 1.5 | 0.0 | 0.0 | 13 |
- The first is self-explanatory: I couldn't log in with the credentials I was instructed to use; had to use someone else's information
- Second: the seeing got very bad at some point in the night (>5") and guiding shut off. They stopped responding, and we had to reboot SISPI several times. Apparently, this was a LabView error...
- Brief interlock error which was resolved by pressing "configure"