Proposal:
2013A-0717
Target of Oportunity:
No
Time Observed:
11.5
Time Engineering:
0.0
Time lost technical:
1.5
Time lost weather:
0.0
Time lost other:
0.0
Description:
Weak Lensing of Low-Redshift Clusters and Large Scale Structures
Primary Investigator:
Ian dell'Antonio
Email:
Institution:
Brown University
Instrument:
CTIO 4m DECam
Organization:
DD
Total Program Time:
13
- The first is self-explanatory: I couldn't log in with the credentials I was instructed to use; had to use someone else's information
- Second: the seeing got very bad at some point in the night (>5") and guiding shut off. They stopped responding, and we had to reboot SISPI several times. Apparently, this was a LabView error...
- Brief interlock error which was resolved by pressing "configure"