Date:
Monday, January 14, 2013
Telescope:
CTIO Blanco 4-m
Submitter:
Bob Nichol
Submitter Email:
Observer Support:
Hernan Tirado
Night Assistant:
Claudio Aguilera
Also Present:
Dave Wittman, Kai Hoffman, Lyndsay Old, David Gerdes
Problems:
None.
Program:
Proposal:
2012B-0448
Target of Oportunity:
No
Time Observed:
4.0
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
DLS u
Primary Investigator:
Thorman (Wittman observing)
Email:
Institution:
UC Davis
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
4
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2013-01-14 | 7.5 | 0.0 | 0.0 | 0.0 | 0.0 | 7.5 |
Problem with DECam guider GUI near start of DES run, but guiding appeared to work properly. Resolved after 30mins.
Good DECam data obtained in typically 1.1-1.2 seeing conditions
Second half: guider stopped guiding, but I was able to restart it and get going again within 5 minutes.