Proposal:
003
Target of Oportunity:
No
Time Observed:
3.5
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
DES
Primary Investigator:
Frieman
Institution:
Fermilab
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
3.5
Problem with DECam guider GUI near start of DES run, but guiding appeared to work properly. Resolved after 30mins.
Good DECam data obtained in typically 1.1-1.2 seeing conditions
Second half: guider stopped guiding, but I was able to restart it and get going again within 5 minutes.