Program 1

Primary tabs

Proposal: 
f/8 and COSMOS Engineering
Target of Oportunity: 
No
Time Observed: 
0.0
Time Engineering: 
8.75
Time lost technical: 
0.0
Time lost weather: 
0.0
Time lost other: 
0.0
Description: 
f/8 and COSMOS Engineering
Primary Investigator: 
Points
Institution: 
CTIO
Instrument: 
CTIO 4m COSMOS
Organization: 
NOAO
Total Program Time: 
8.75