PF check list for the night assistant
Image quality related issues only
5 October 1999
This document is at: http://www.ctio.noao.edu/telescopes/opteng/pfchecklist.html
1. Check "temp4m" and "weat" in order to detect eventual problems.
2. Just after sunset, open the lateral sliding doors.
3. Check that CORR is on.
4. When the astronomers are starting up, remind them about the need to take focus sequences: one just after focusing the instrument (and before taking science data), and a second one by the time it is one hour before morning twilight (consult with them what time will be most convenient in order to minimize the impact on their science program).
5. Have the first focus sequence done.
6. Remind the astronomer when it is time to do the second sequence.
7. Check periodically "temp4m" and "weat".
8. At the end of the night:
mirror sucker OFF
air extractors OFF
mirror cooler ON
dome air stirring fan ON