M1=I1 M2=I1-I2 M3=I1-I2+I3 I1=M1 I2=M1-M2 I3=M3-M2 O1 = M1 + A0 + A1*I2 + A2*X + A3*T O2 = M2 + B0 + B1*I2 + B2*X + B3*T O3 = M3 + C0 + C1*I3 + C2*X + C3*T A3=0. m:r,i,v B3=0. i:R,R-I,V-I C3=0. A0 = 1.5862 0.0029 << 21.6 2 3.29 ave 3 nights 11/01 1.5m B0 = 2.4452 0.0029 << 14.6 2 2.70 C0 = 1.6359 0.0029 << 7.7 2 1.96 A1 = -0.0085 0.0053 << 0.8 2 0.64 B1 = -0.0166 0.0060 << 2.1 2 1.02 C1 = -0.0266 0.0037 << 4.7 2 1.54 A2 = 0.0902 0.0062 << 0.2 1 0.39 B2 = 0.0587 0.0075 << 1.7 1 1.29 C2 = 0.1300 0.0082 << 0.1 1 0.26 S1 = 0.006 << n1,n2,n3 S2 = 0.0000160 << n1,n2,n3 S3 = 0.0000092 << n1,n2,n3