Proposal:
2016A-0618
Target of Oportunity:
No
Time Observed:
4.5
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
A Search for Substructure at the Southern edge of the LMC
Primary Investigator:
Dougal Mackey
Email:
Institution:
ANU
Instrument:
CTIO 4m DECam
Organization:
N/A
Total Program Time:
4.5
None.