Proposal:
2013B-0440
Target of Oportunity:
No
Time Observed:
8.5
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
SMASH Survey
Primary Investigator:
Nidever
Email:
Institution:
LSST
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
8.5
Guider worked well tonight, thanks all for the attention during the day.