Needed to restart sispi due to banding observed in first on-sky exposures. Was associated with a group of ccds connected to one backplane. Looks like a clocking issue. Restart fixed problem.
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2016-01-03 | 0.0 | 0.0 | 0.0 | 7.75 | 0.0 | 7.75 |
Links
[1] mailto:frieman@fnal.gov
[2] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/2840/delete?destination=print/node/9117
[3] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/2840/edit?destination=print/node/9117
[4] mailto:dnidever@lsst.org
[5] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/2841/delete?destination=print/node/9117
[6] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/2841/edit?destination=print/node/9117
[7] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/add/node/9117?destination=print/node/9117
None.0
SMASH team: give up at 5 am.