Proposal:
2012B-0001
Target of Oportunity:
No
Time Observed:
7.75
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Primary Investigator:
Frieman
Email:
frieman@fnal.gov [1]
Institution:
Fermilab
Instrument:
CTIO 4m DECam
Total Program Time:
7.75
DECam night summary: file:///usr/remote/user/sispi/nightsum-reports/nightsum-2015-11-29/nightsum.html