Proposal:
2013A-9999
Target of Oportunity:
No
Time Observed:
0.0
Time Engineering:
7.75
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
LSST Calibrations testing, collimated beam projector
Primary Investigator:
Chris Stubbs
Email:
Institution:
CTIO
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
7.75
Successful night for LSST calibrations test engineering team of Chris Stubbs, Robert Lupton, Merlin, Michael, Kairn & Patrick. Much learned. Stubbs declares the exercise "a roaring success".