Proposal:
2012B-0001
Target of Oportunity:
No
Time Observed:
8.0
Time Engineering:
0.25
Time lost technical:
0.25
Time lost weather:
0.0
Time lost other:
0.0
Description:
DES
Primary Investigator:
Josh Frieman
Email:
frieman@fnal.gov [1]
Institution:
Fermilab
Instrument:
CTIO 4m DECam
Total Program Time:
8.5
Poor and unstable seeing conditions during approx. one hour of the final quarter (with seeing values ranging from 1.4 to 1.8). DIMM seeing was more stable and closer to 1 during that time (maximum being 1.3).