Proposal:
2013A-9999
Target of Oportunity:
No
Time Observed:
0.0
Time Engineering:
8.5
Time lost technical:
0.0
Time lost weather:
3.0
Time lost other:
0.0
Description:
Engineering
Primary Investigator:
Alistair Walker
Email:
Instrument:
CTIO 4m DECam
Total Program Time:
11.5
Bad weather, started to clear at 03:30 am when we opened. David James made a fine Y band scan with DECal. After that spent 3.2 hours doing 4MAP "hysterisis" scans. Final 45 min long exposures to exercise guider, clouds coming back.