Proposal:
2012B-0001
Target of Oportunity:
No
Time Observed:
4.25
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Instrument:
CTIO 4m DECam
Total Program Time:
4.25
None.
Second Half: Power outage at 5.10 local time. System had to be restarted.
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2015-02-13 | 8.5 | 0.0 | 0.0 | 0.0 | 0.25 | 8.75 |
Links
[1] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/2140/delete?destination=print/node/7265
[2] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/2140/edit?destination=print/node/7265
[3] mailto:belardiclaudia@gmail.com
[4] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/2141/delete?destination=print/node/7265
[5] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/2141/edit?destination=print/node/7265
[6] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/add/node/7265?destination=print/node/7265
None.