Proposal:
Engineering
Target of Oportunity:
yes
Time Observed:
0.25
Time Engineering:
7.5
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Primary Investigator:
Alisair Walker
Email:
Institution:
CTIO
Instrument:
CTIO 4m DECam
Total Program Time:
7.75
Clear night, record-breaking image quality