Proposal:
2012B-0001
Target of Oportunity:
No
Time Observed:
3.75
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
Dark Energy Survey
Primary Investigator:
Frieman
Email:
frieman@fnal.gov [1]
Institution:
Fermilab
Instrument:
CTIO 4m DECam
Total Program Time:
3.75
None - First Half
Second Half - @5:20am Guider produced triple images, could not resolve with reset or configure, restart SISPI 2x did not resolve the problem. Error was in guider CCD's, needs attention. Note- SISPI restart required previous night, errors regarding SISPI lock noted. Restart resolved the issue. related?